Construction of new building Under Up Gradation of Habigonj Sadar Hospital From 100 to 250 beds. (6 storied building with 8 Storied Foundation in/c Sanitary works & Internal Electrification). Sub-Head: Electrical Connection of Medical equipment Emergency Source of Connection A/C Cables). During Financial year of 2016-2017.